Firefox/Input/Meeting Notes

From MozillaWiki
< Firefox‎ | Input
Revision as of 15:49, 9 September 2010 by Adesai (talk | contribs) (→‎8-31-2010)
Jump to navigation Jump to search

Meeting Notes

1.8

9-9-2010

What's been completed:

  • Fred
  • Dave
  • Ryan
    1. Mobile search came in
  • Michael
  • Hamilton
    1. Demo'd on LDA Topic Modeling per Platform & Type
  • Stephen
    1. Filed/verified bugs
    2. Some data loss
  • Aakash
    1. Was on vacation

What we aim to do next and when we expect to accomplish them:

  • Frederic:
  • Dave
  • Ryan
    1. Hands tied with family and socorro, will take small bugs if available
  • Michael
    1. Fix 1.8 bugs related to Sites, 9/16
  • Hamilton
    1. Working on LDA Topic Modeling
  • Stephen
    1. File/verify bugs
    2. Check it out with Android
  • Aakash
    1. Work on blog post for 1.8, 9/16
    2. Figure out dev estimation on 2.0, 9/14

8-31-2010

What's been completed:

  • Fred
    1. Working on Mobile Dashboard, will commit 8/31
  • Dave
  • Michael
    1. Getting fennec set up with sites
  • Andres
    1. --
  • Ryan
    1. Pushed last 1.7 bug, there was a regression
    2. Will try to pick up some 1.8
  • Stephen
    1. Filed/verified bugs
  • Aakash
    1. Setup 2.0 meeting
    2. Filed some bugs
  • 3 Created 1.7 blog post

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Complete UX overhaul of mobile dashboard, 9/6
  • Ryan
    1. Fix assigned 1.8 bugs, 9/6
  • Dave
  • Michael
    1. Fix 1.8 bugs related to Sites, 9/6
  • Andres
    1. --
  • Stephen
    1. file/verify bugs (swamped with other projects)
  • Aakash
    1. Talk to folks in platform meeting about Input, 8/31
    2. Hold the 2.0 planning meeting
    3. Help Stephen get set up on his mobile device, 8/31

1.7

8-26-2010

What's been completed:

  • Fred
    1. 1.7 Bugs Fixed
    2. L10n notified
  • Dave
    1. Themes up on Sites
  • Michael
    1. Fixed Sites bugs for 1.7
  • Andres
    1. --
  • Ryan
    1. Fixed last bug, need a push
  • Stephen
    1. Finishing up QA Completeness
  • Aakash
    1. Done with 2.0 PRD (on the wiki)
    2. Created 1.8 wiki

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Complete UX overhaul of mobile dashboard, 9/6
  • Ryan
    1. Get bug pushed by Dave
    2. File all necessary bugs needed to complete 1.8 milestone, 8/27
  • Dave
    1. Push Ryan's bug, enjoy the weekend
    2. Work on 1.8 bugs
  • Michael
    1. Fix 1.7 bugs related to Sites, 8/24
  • Andres
    1. --
  • Stephen
    1. file/verify bugs
  • Aakash
    1. Hold a planning meeting for 2.0
    2. on vacation (not available) from 9/1-9/5
    3. Work on communication effort to promote Input after 1.7, 8/31
    4. Create 1.7 release blogpost, 8/26

Additional Notes:

  • We're going to be in Firefox Proper
  • We're planning to be in Nightly Builds

8-24-2010

What's been completed:

  • Fred
    1. Fixed remaining P1/P2 bugs
    2. Need follow-up with michaelk
  • Dave
    1. Done with Themes UX Overhaul, need to have tests automated
  • Andres
    1. --
  • Ryan
    1. Fixed 1 of the bugs
  • Stephen
    1. Verified some bugs and filed some more
  • Aakash
    1. 3/4 done on 2.0 PRD
    2. Created 1.8 wiki

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Finish P1/P2 bugs, 8/24
  • Ryan
    1. Fix last bug and work with wenzel on committing process, 8/24
  • Dave
    1. Themes UX Overhaul, 8/24
  • Michael
    1. Fix 1.7 bugs related to Sites, 8/24
  • Andres
    1. --
  • Stephen
    1. file/verify bugs
  • Aakash
    1. Finish Input 2.0 PRD, 8/24
    2. Talk to mrz about release time
    3. Update 1.8 wiki, 8/24
    4. Work on communication effort to promote Input after 1.7, 8/31
    5. Create 1.7 release blogpost, 8/26

8-19-2010

What's been completed:

  • Fred
    1. Only 1 P1 bug left
    2. Assigned 2 bugs to Ryan
    3. Working on RTL support
  • Dave
  • Michael
    1. staging site now has sites dump coming in on a daily basis
    2. fixed P2 bugs for Sites
  • Andres
  • Ryan
    1. Been busy with Socorro, but will work on bugs today and tomorrow
  • Stephen
    1. Verified some bugs and filed some more
    2. Has some sites questions that should be answered with chowse's
    3. Got another free load test report
  • Aakash
    1. Finished 2.0 definition

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Finish P1/P2 bugs, 8/23
    2. Contact l10n, 8/19
  • Ryan
    1. Fix assigned bugs, 8/23
  • Dave
    1. Themes UX Overhaul, 8/23
  • Michael
    1. add (unit) tests for sites generation as soon as I find the time
    2. Fix 1.7 bugs related to Sites
  • Andres
    1. --
  • Stephen
    1. file/verify bugs
  • Aakash
    1. Finish Input 2.0 definition, 8/24
    2. Work on communication effort to promote Input after 1.7, --
    3. Create 1.7 release blogpost, 8/24

8-17-2010

What's been completed:

  • Fred
    1. Working on UX Overhaul
    2. fixed most P1 bugs
      • won't be ready for tomorrow, but we'll need a few days
  • Dave
    1. Brought up a half-done sites for the ux overhaul
  • Michael
    1. made the changes to the sites process that were needed for Bugs 587616, 587588, 586915
    2. added an IT ticket (Bug 587942) to regularly run migrations for sites on stage
  • Andres
  • Ryan
    1. Sandbox is up and running
    2. WIll pick up bugs
  • Stephen
    1. Verified some bugs
    2. Ran LoadImpact and Jmeter
      • Got some 500 errors on staging
      • Running 40 requests/sec and 300kb/sec with no issue
  • Aakash
    1. Start communication effort for Input Dashboard
    2. Filed some bugs

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. UX overhaul
    2. Give heads up when pages are ready to be QA'd
  • Ryan
    1. Work with Fred and fix assigned bugs
  • Dave
    1. Themes UX Overhaul
  • Michael
    1. - make sure the sites production db is migrated before 1.7 goes online (please notify me when code freezes)
    2. add (unit) tests for sites generation as soon as I find the time
    3. Fix 1.7 bugs related to Sites
  • Andres
    1. --
  • Stephen
    1. file/verify bugs
    2. try to look into happy/sad load testing
  • Aakash
    1. Finish Input 2.0 definition, 8/24
    2. Work on communication effort to promote Input, --
    3. Create 1.7 release blogpost, 8/24

1.6.2

8-12-2010

What's been completed:

  • Fred
    1. Working on UX Overhaul
  • Dave
    1. Almost fully sandboxed
  • Andres
  • Stephen
    1. Verified some bugs
    2. Load testing as well
  • Aakash
    1. Finished data flow, its on the wiki now
    2. Created 1.6.2 blogpost

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Will release on branch by end of today
    2. Give an update on possibility of release on Wednesday, 8/16
  • Ryan
    1. Take a look at bug queries, pick up a few bugs, 8/13
    2. Fix assigned 1.7 bugs, 8/16
  • Dave
    1. Fix assigned 1.7 bugs, 8/16
  • Andres
  • Stephen
    1. vacation, vishal verifying bugs
  • Aakash
    1. Input 2.0 definition
    2. Create 1.7 release blogpost

8-10-2010

What's been completed:

  • Fred
  • Dave
    1. Hudson is up, coverage is kinda crap - 67%
    2. Individual pieces of feedback linked
  • Andres
  • Michael
    1. Sites is up
  • Stephen
    1. verify some bugs
    2. load testing as well
  • Aakash
    1. finished data flow
    2. github commits are working

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. UX overhaul, 8/16
  • Ryan
    1. UX Overhaul, 8/16
  • Dave
    1. Take a look at 1.7 bugs, 8/12
  • Andres
  • Michael
    1. Maintain Sites, 8/12
  • Stephen
    1. vacation, vishal verifying bugs
  • Aakash
    1. Prepare 1.6.1 blogpost, 8/5
    2. input 2.0 definition

1.6.1

8-05-2010

What's been completed:

  • Fred
    1. Held UX Overhaul meeting with chowse
    2. Atom Feeds
  • Dave
    1. Worked on Hudson and removed smiley face from dashboard
  • Andres
    1. introduced us to Hamilton
  • Michael
    1. Don't have access to prod db, need help from IT
    2. need uptake with dmoore
    3. code is r+'d by fwenzel
  • Stephen
    1. load-testing being worked on
    2. random numbers for search query terms brings down
  • Aakash
    1. talked to Hamilton about things we're working on and our needs
    2. finished another rev of data flow chart
    3. sent out inquiries about 2.0 definition to triagers

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Wait on chowse UX Overhaul, 8/10
  • Dave
    1. Hudson for 1.7
  • Andres
    1. continue with parsing through adjectives; modeling by topic
  • Michael
    1. Sites, 8/4
  • Stephen
    1. load testing, 8/4
    2. verify bugs
  • Aakash
    1. work on data flow, 8/5
    2. work on Input 2.0 definition, 8/16
    3. Prepare 1.6.1 blogpost, 8/5
    4. figure out why my github commits to master are not working, 8/5

8-03-2010

What's been completed:

  • Fred
    1. Took a look at the designs
  • Dave
    1. Started on hudson, build is failing
  • Andres
    1. parse through adjectives; modeling by topic
  • Michael
    1. 1st review completed
    2. manual SQLs -> django to access db needs to be changed
    3. is thinking about pre-processing the data before Sites is
  • Stephen
    1. verified some bugs
  • Aakash
    1. Set up a meeting UX Overhaul
    2. Set up a meeting with Load Testing
    3. created the first draft of a data flow chart
    4. Sent out 1.6 blogpost

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Have meeting with chowse about UX Overhaul
    2. Start on UX Overhaul
  • Dave
    1. Fix Atom Feed, dashboard smiley face and hudson bugs, 8/4
  • Andres
    1. Sites, 8/4
    2. Introduce Hamilton to the group
    3. continue with parsing through adjectives; modeling by topic
  • Michael
    1. Sites, 8/4
  • Stephen
    1. load testing ramp-up meeting, 8/4
    2. help out with UX Overhaul
  • Aakash
    1. work on data flow, 8/5
    2. work on Input 2.0 definition, 8/16
    3. Push 1.6.1 release back (After word from mkurze), 8/3
    4. Prepare 1.6.1 blogpost

1.6

7-29-2010

What's been completed:

  • Fred
    1. Finished all remaining (and found) P1/P2 bugs
  • Dave
    1. Cluster
    2. Finished all remaining (and found) P1/P2 bugs
  • Andres
    1. Sites prototyped on a local server
    2. Met with IT for Sites set up with metrics db cluster
  • Michael
    1. Sites prototyped on a local server
    2. Met with IT for Sites set up with metrics db cluster
  • Stephen
    1. Couldn't get a hold of oremj, will meet with him next week
  • Aakash
    1. Worked on promoting out Input 1.6's and future releases
    2. Worked on new UX with chowse

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. UX Overhaul
  • Dave
    1. 1.6.1 bugs
  • Andres
    1. Sites, 8/3
  • Michael
    1. Sites, 8/3
  • Stephen
    1. load testing ramp-up, 8/2
  • Aakash
    1. Set up a meeting UX Overhaul, 7/29
    2. Set up a meeting with Load Testing, 7/29

Additional Notes:

  • Need time on working on better code
  • Get hudson up
  • Let's not fight fires

7-27-2010

What's been completed:

  • Fred
    1. Finished Mobile
    2. URL submission on happy reports
  • Dave
    1. Cluster
  • Andres
    1. Sites prototyped on a local server
    2. Get PDF for Sites info over the past week
  • Michael
    1. Sites prototyped on a local server
  • Stephen
    1. Found Grinder, JMeter and ran them
    2. Need another sphinx node to run it against
  • Aakash
    1. Get the new Cluster/Sites buttons
    2. Worked on new UX with chowse

What we aim to do next and when we expect to accomplish them:

  • Frederic:
  • Dave
  • Andres
    1. Get PDF of Sites report, 7/29
  • Michael
    1. Get term-matching onto trends box, 7/29
  • Stephen
    1. Work on optimization of production sphinx node with oremj, 7/27
    2. QA 1.6 Changes
  • Aakash
    1. Work on UX overhaul with chowse, 7/29
    2. File a bug on removing sites buttons, 7/27

Additional Notes:

  • Are clusters and sites filtering by the product version? [aakash]
    1. There's no mixing, so we'll only get beta 2 information.

7-22-2010

What's been completed:

  • Fred
    1. got the url (m.stage.input.mozilla.com) working
    2. submission pages are up, won't be completely done by 7/23
  • Dave
    1. Finished RSS Feeds, working on Clusters
  • Andres
    1. Finished algorithm, working on UI; targeting 7/26
    2. Got python on metrics db working
  • Michael
    1. look up at Andres
  • Stephen
    1. Jmeter is a bit complicated;
  • Aakash
    1. Finished PRD 1.6 and re-uptake on Sites page

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Finish Mobile, 7/27
  • Dave
    1. Cluster, 7/26
  • Andres
    1. Get prototype of Sites, 7/26
  • Michael
    1. Get prototype of Sites, 7/26
  • Stephen
    1. Investigate into load testing (talk to oremj), 7/27
    2. Figure out differences between staging and production for load testing
  • Aakash
    1. UX Refresh with Chris Howse, 7/27
    2. Work with Lee Tom on new buttons, 7/27

1.5

7-20-2010

What's been completed:

  • Fred
    1. On verbatim and have 7 locales already completed
    2. fixed all P1/P2 bugs that were blockers for 1.5
  • Dave
    1. Almost done with RSS Feeds; Will go in a bit;
  • Andres
    1. Working on "Sites";
    2. Q's: How do we analyze sites? Siphon the domains and then perform cluster analysis from there.
  • Michael
    1. Last thursday/friday, worked on term-matching
    2. Setting up reporter project locally, will need Fred's help
    3. Q's: How do we write back into the tool? File an Input bug.
  • Stephen
    1. Verified all bugs and filed some bugs.
  • Aakash
    1. IT will help out in a big way
    2. PRD for 1.6 completed

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Work on Mobile, 7/23
  • Dave
    1. Cluster, 7/26
  • Andres
    1. Finish up pseudo code of "sites", 78/
  • Michael
    1. File Input Bug for data exchange workflow
    2. Get prototype of Sites, 7/26
  • Stephen
    1. Investigate into load testing, 7/22
  • Aakash
    1. Work through mock-ups and requirements with each feature, 7/26
    2. Figure out better triage techniques, 7/26
    3. UX Refresh with Chris Howse, 7/23

7-15-2010

What's been completed:

  • Fred
    1. Completed Translate, l10n possible/not on verbatim
  • Dave
    1. Changes haven't been made yet, got busy with AMO stuff
  • Stephen
    1. Krupa is interested, but he'll be the only person needed for this release
  • Aakash
    1. Talked to Chris Howse and he'll start on UX work next week with Input
    2. Worked with Metrics on Web Problems Page

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. Get on verbatim 7/19;
  • Dave
    1. Complete RSS Feeds, 7/16
    2. Will try to get it in Clusters, 7/23
  • Stephen
    1. Ready to QA and got updated on bug system
  • Aakash
    1. communicate relative importance of Input to IT, 7/16

7-13-2010

Feeds:

  • Django native cache; headers get picked up by Zeus and it doesn't hit the webhead.

L10n:

  • Fred marked them as localizable and need to put them in verbatim. Will need strings separated for mobile pages.

Clusters:

  • Aakash: Get a review from Chris Howse
  • Warning Thing
  • Doing a happy/sad report by version. It's a week's worth of data.
  • Would rather prefer a week's worth of data because it's more useful and data won't get too large if we work on 3 week beta cycles.

Scheduling:

  • 7/28: Searches with Feeds, L10n of Webpages, Translation Link and Clusters Beta
  • String Freeze: 7/19
  • Code Complete 7/21
  • QA until 7/28
  • Release 7/28

1.0

6-28-2010

Things we did well?

  • Fred: requirements were very clear, mock-ups helped; execution was very much on-time;
  • Aakash: pretty much what fred said; fred's coding was beast-like in its intensity; we got help from everyone we asked

Things we didn't do well?

  • Fred: background changes a day before we launched; timeline was very short;
  • Aakash: https stuff; blogposts were confusing since beta was not out yet to use the pages; VPN set-up 1 week after requested by fred

Things that are important to work on for next rev?

  • get an idea about what marketing might want from Input early on
  • When going live, Input needs an apache reload

Overall

  • things were very good considering the timeline

6-22-2010

What's been completed:

  • Frederic
    1. All remaining bugs fixed
  • Aakash
    1. Tested Feedback Extension and identified nits to change
    2. Verified warning notification on submission pages

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. GO LIVE!
    2. Create blog post
  • Aakash
    1. Create blog post/promotions as necessary and link Fred's stuff in it

6-21-2010

What's been completed:

  • Frederic
    1. Pretty much all bugs fixed
    2. Filed bug 573468 to go live
  • Aakash
    1. Done with Privacy Policy stuff
    2. verified fixes

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. fix remaining bugs
    2. Try out Lee Tom's next background image if he gets it in time
  • Aakash
    1. Test out Jono's fix
    2. Verify warning notification on submission pages

6-20-2010

What's been completed:

  • Frederic
    1. Fixed a bunch of bugs over the weekend
  • Aakash
    1. talking to legal about implementation of privacy policy text on submission pages
    2. verified fixes
    3. promoted out input to a wider audience and got some testers (go kbrosnan!)

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. fix remaining P1-P3's
    2. file bug to go live Tuesday night PST
  • Aakash
    1. hash out implementation with legal and give Fred a solution
    2. talk to Jono to comment out URL inclusion on extension side

6-16-2010

What's been completed:

  • Frederic
    1. finished all P1/P2's except 1
    2. received horlander's icons
  • Aakash
    1. finished 2nd set of mock-ups for mobile firefox
    2. verified p1 and p2 fixes

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. fix vendor directory issue for IT to get up on staging
    2. load testing
    3. fix remaining P1's and P3's
  • Aakash
    1. test Input on staging
    2. promote out input to a wider audience (i.e. key stakeholders: qa, marketing, ux, fx-team)

6-15-2010

What's been completed:

  • Frederic
    1. finished all P1's except 1
    2. replied to horlander
  • Aakash
    1. followed-up with stephen horlander
    2. worked on implementation with mobile firefox
    3. filed a few more bugs

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. p2 bugs and remaining p1 bug
  • Aakash
    1. test changes after p1 and p2 fixes are done
    2. look into load testing


6-14-2010

What's been completed:

  • Frederic
    1. got hosed due to late issue with the weave team
  • Aakash
    1. sent graphics via e-mail
    2. extension created by jono and we're testing that side
    3. all bugs triaged

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. p1 bugs
    2. reply back to horlander about smiley icon sizes on submission pages & sentiment box
  • Aakash
    1. test changes after p1 fixes are done
    2. look into load testing

6-10-2010

What's been completed:

  • Frederic
    1. completed beta page
    2. wrote unit tests
    3. did not file bug since app is changing quite a bit
  • Aakash
    1. gave list of user agents
    2. got VPN access and tested/filed bugs
    3. created bugzilla component
    4. gave mock-up for download page

What we aim to do next and when we expect to accomplish them:

  • Frederic
    1. fixing P1/P2's
    2. file a bug to staging when all P1/P2s are fixed
  • Aakash
    1. follow up horlander
    2. lee tom for icons and graphics
    3. work on layout of search results
    4. file/triage bugs as needed

6-08-2010

What's been completed:

  • Frederic:
    1. Search is working, pop-down for URLs, menu box options
  • Aakash:
    1. Got Lee Tom to work on Dashboard and Thank You page graphics and Horlander to work on platform-specific icons
    2. Jono is going to incorporate button implementation with Feedback
    3. Metrics and TP will give info on riak implementation once its completed

What we aim to do next and when we expect to accomplish them:

  • Frederic:
    1. create intermediary page to download beta (6/9)
    2. write unit test to make sure all cases are covered to send users to the download page
    3. file a bug on putting dashboard and submission pages to staging for input-stage.mozilla.com, input.stage.mozilla.com/happy input-stage.mozilla.com/sad (6/9)
  • Aakash
    1. make a list of user agents 6/8
    2. get VPN access 6/8
    3. give text for download page 6/8
    4. get info on uservoice/survey api implementation with mktg on fx betas 6/10

6-01-2010

What's been completed:

What we aim to do next and when we expect to accomplish them:

  • Fred (by Thursday 6/3):
    1. get search working
    2. pop-down for URLs when clicked ( go to page only when hyperlink clicked)
    3. implement in menu box options
  • Aakash (by Thursday 6/3):
    1. get some designer love for happy/sad faces, dashboard header and follow-up buttons on thank you page
    2. start looking into client side
    3. getting info from metrics on implementation help for riak on rev 2

Additional Notes?

  • Aakash: get set up with VPN for future demos

5-27-2010

Status Update:

  • Fwenzel
    • completed = forms (post positive and negative feedback), completed-ish user agent parser,
    • questions = app that searches with riak?, interval on dashboard is? (1 day, 1 week, 1 month)
  • aakashd
    • getting info from metrics on implementation help for riak on rev 2

Next Steps:

  • fwenzel = making django app/dashboard (late next week)
  • aakashd = looking at list of swear words (mid-5/27)