QA/Fennec/Milestones/9.0/Beta
< QA | Fennec | Milestones | 9.0
Jump to navigation
Jump to search
Fennec 7.0 Beta Test Plan
« Milestones | Fennec 9.0 Beta | » Fennec 9.0 Beta 1
Overview
The goal of this Overall Test Plan is to lay out our testing strategy, determine who will own certain test areas and when they will do it and, finally, track the status. All of our releases are tested off of the "Fennec 7.0 Beta Catch-All Test Run" on the Litmus TCM. For more information about Fennec 7.0, take a look at the mobile team's Feature Planning page.
Project contacts
PM: Erin Lancaster (erinlancaster)
Dev: Lead: Mark Finkle (mfinkle)
Build: John Oduinn (joduinn)
QA: Ioana Chiorean (Ioanachiorean)
Schedule
- Start Date: 11/08/2011
- End Date: 12/20/2011
Bugs in Release
Beta Testplans
« Milestones | Fennec 9.0 Beta | » Fennec 9.0 Beta 1
- Fennec 9.0 Beta 1
- Fennec 9.0 Beta 2
- Fennec 9.0 Beta 3
- Fennec 9.0 Beta 4
- Fennec 9.0 Beta 5
- Fennec 9.0 Beta 6
- Fennec 9.0 RC1
Build Location and IDs
- Go to the candidates folder in our ftp directory
- Go to the "latest-mozilla-beta" folder
- Download and install the latest 9.0b-candidate build onto your Android phone/device