DevTools/Planning/Performance
Jump to navigation
Jump to search
Full Query
Performance Management Tools Kanban
Kanban PM Work Stack
The PM work stack contains all the user stories that need to be scrubbed and prioritized by PM and engineering. In terms of Bugzilla, it means status = "NEW" and the PM-Scrub flag has been set to ?.
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Kanban "Ready to Work" Stack
The backlog contains any user story that hasn't been scrubbed and prioritized by PM or engineering. In terms of Bugzilla, it means status = "NEW" and the PM-Scrubb has been set to ?.
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Completed
ID | Priority | Summary | Status | Assigned to |
---|---|---|---|---|
625846 | -- | Add Heap Snapshot and Analysis tools | RESOLVED | |
879008 | P2 | New UI for the sampling Profiler | RESOLVED | Victor Porof [:vporof][:vp] |
929114 | -- | Live Frame Rate Visualization | RESOLVED | |
931898 | -- | Recorded Frame rate visualization | RESOLVED | |
1011224 | -- | Performance tools are available in WebIDE | RESOLVED |
5 Total; 0 Open (0%); 5 Resolved (100%); 0 Verified (0%);