193
edits
Ayoshihara (talk | contribs) |
Ayoshihara (talk | contribs) |
||
Line 38: | Line 38: | ||
= Major Test Areas = | = Major Test Areas = | ||
<!-- describe major test areas of the feature and major test cases. Once the plan is done, these major test cases can be fleshed out into litmus or automated test cases --> | |||
Debug builds are used to: | |||
* Testing of new patches or regression if needed. | |||
= Schedule/milestones = | = Schedule/milestones = |
edits