Firefox OS/DeviceQA/2014-11-17WeeklyReport: Difference between revisions

Jump to navigation Jump to search
no edit summary
(weekly report)
No edit summary
Line 60: Line 60:
** Verify sprint 8/ 9 tickets of productivity
** Verify sprint 8/ 9 tickets of productivity
||
||
* Week W48 (11/24~11/28)
** Power consumption planning / testing sheet creation / create test case
** [2.2][SysP] Study 2.2 feature spec
** [2.2][Prod] Study 2.2 feature spec
|-
|-
| Eric
| Eric
Confirmed users
49

edits

Navigation menu