SmartPhone Code Transition: Difference between revisions

→‎UX Specs: Moved completed deliverables to an archive section at the bottom of the site
No edit summary
(→‎UX Specs: Moved completed deliverables to an archive section at the bottom of the site)
Line 252: Line 252:
----
----


==UX Specs==
== ==
 
=='''Archived Completed Deliverables'''==
{| class="wikitable"
! style="text-align: center;" | Milestone
! style="text-align: center;" | Date
! style="text-align: center;" | Status
! style="text-align: center;" | Status Notes
|-
| Gather feedback on the plan after discussion at 2/9 Engineering Program Review.
| 2/12/16
! style="background:#00B2FF;" | Done
| 2/9 review was well attended and lots of feedback was shared in the Transition of Firefox OS Code Base Proposed Plan.  2-3 additional reviews were held via videoconf.  Participation was good.
|-
| Identify engineers to work on the code transition plan
| 2/12/16
! style="background:#00B2FF;" | Done
| Identified engineers' names have been inserted into the plan. We've documented which components of the plan they'll each work on and for how long.
|-
| Hold a final review of the proposed plan with the engineering team
|2/12/16
! style="background:#00B2FF;" | Done
| Final reviews held via email.
|-
| Present plan at weekly Engineering Program Review
| 2/16/16
! style="background:#00B2FF;" | Done
| Wasn't ready by the 2/16 review but plan was submitted to Faramarz 2/19 via email.
|-
| Present plan at All Hands
| 2/25/16
! style="background:#00B2FF;" | Done
|
|-
|}


----
----
==Reference Links==
==Reference Links==