Line 28: | Line 28: | ||
| 0.4 | | 0.4 | ||
| on track | | on track | ||
| Boriss | | Boriss estimates design delivery by 5/1. Estimating two weeks for infrastructure implementation, as of 4/16. Then a 2nd phase once design is in-hand. | ||
|- | |- | ||
| 104 | | 104 |