SeaMonkey:Release Process:2.0.13: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 56: Line 56:
  Start: Sun Mar 20 19:02:14 PDT 2011
  Start: Sun Mar 20 19:02:14 PDT 2011
  End: Sun Mar 20 19:02:39 PDT 2011
  End: Sun Mar 20 19:02:39 PDT 2011
=== Updates and Verification ===
*updates ran into a problem, due to my mess with 2.0.12 earlier fixed that and re-ran. manually triggered build, all good.
=== Push Updates to the beta Channel ===
~/bin/backupsnip 2011*-SeaMonkey-2.0.13-beta
~/bin/pushsnip 2011*-SeaMonkey-2.0.13-beta
=== Copy ZIPs ===
Used <code>zipcopy.sh</code> as documented in [[SeaMonkey:Release_Process:2.0.3|2.0.3]] notes to provide ZIPs along with the installers for Windows and additionally copy the 64bit file over to contrib.
=== Copy Language Packs ===
Used <code>langpackmove.sh</code> as documented in [[SeaMonkey:Release_Process:2.0b1|2.0b1]] notes to move the langpacks into the directory we want them in for release.
=== Create Checksums ===
With <code>make-checksums.sh</code> as documented in [[SeaMonkey:Release_Process:2.0.3|2.0.3]] notes, created MD5SUMS and SHA1SUMS files containing all files we release - copying the README from last time and replacing the versions as needed, as well as doing the same for Linux x86_64.


=== Verification ===
=== Verification ===
Line 68: Line 89:
=== Update Channels ===
=== Update Channels ===


* Push to beta:
* Push to beta: Tue Mar 22
* Push to mirrors:
* Push to mirrors:
* Push to release:
* Push to release:
Account confirmers, Anti-spam team, Confirmed users, Bureaucrats and Sysops emeriti
1,529

edits