Engineering/Goals/2012Q1: Difference between revisions

Jump to navigation Jump to search
Line 1: Line 1:
=== Overall Engineering Goals for 2012 Q1 ===
=== Overall Engineering Goals for 2012 Q1 ===
* Ship beta of native Android UI version of Fennec in time for MWC.
* {{miss|Ship}} beta of native Android UI version of Fennec in time for MWC.
* Ship minimal impact update system for Firefox 12 (Branch Date: Jan 31, 2012).
* {{ok|Ship}} minimal impact update system for Firefox 12 (Branch Date: Jan 31, 2012).
* Land BrowserID API in Firefox.
* {{miss|Land}} BrowserID API in Firefox.
* Optimized sync experience:  Sync on Android, optimized setup and authentication, identify and fix user experience to decrease drop off rate.  NOTE:  Need metrics and clarification of success factors.
* Optimized sync experience:  Sync on Android, optimized setup and authentication, identify and fix user experience to decrease drop off rate.  NOTE:  Need metrics and clarification of success factors.
* Land Apps API in Firefox.
* {{drop|Land}} Apps API in Firefox.
* Demonstrate B2G at MWC and complete product demonstration.
** {{done|Work}} with the apps team prioritized front-end integration with desktop home page over API. This modified goal is done, but the modification crystallized late in the quarter.
* {{done|Demonstrate}} B2G at MWC and complete product demonstration.
* Placeholder: Responsiveness/Perf/Security achievement:  Current suggestion:  Move 10 modules doing I/O (primarily disk I/O) off the main thread.
* Placeholder: Responsiveness/Perf/Security achievement:  Current suggestion:  Move 10 modules doing I/O (primarily disk I/O) off the main thread.
* GC, and CC goal:  50ms pause time limit.
* GC, and CC goal:  50ms pause time limit.
* Ship ARM V6
* Ship ARM V6
* {{prev|Conduct and publish}} a [https://wiki.mozilla.org/RapidRelease/ImpactAssessment comprehensive impact assessment] for our fixed release process and implement identified changes to address problems.
* {{done|Conduct and publish}} a [https://wiki.mozilla.org/RapidRelease/ImpactAssessment comprehensive impact assessment] for our fixed release process and implement identified changes to address problems.


=== Individual Team Goals ===
=== Individual Team Goals ===
Confirmed users
1,349

edits

Navigation menu