Line 32: | Line 32: | ||
** Covered all the functional and regression testing areas | ** Covered all the functional and regression testing areas | ||
** Covered any special exploratory testing that may be needed by a special feature targeted in that release | ** Covered any special exploratory testing that may be needed by a special feature targeted in that release | ||
* | * Perfomance team sign-off to ensure we have met the FC ready criteria | ||
'''Notes :''' | '''Notes :''' | ||
* Hard string freeze happens in two weeks as we enter the the FC phase giving the localization team four weeks to localize the strings and prepare for a testrun at FC. FC will typically mark the launch of the initial l10n test run. | * Hard string freeze happens in two weeks as we enter the the FC phase giving the localization team four weeks to localize the strings and prepare for a testrun at FC. FC will typically mark the launch of the initial l10n test run. | ||
== CODE COMPLETE (CC)== | == CODE COMPLETE (CC)== | ||
This Code Complete (CC) milestone marks the completion of the release from Mozilla and partner chipset vendors. This is our declaration that we are ready to ship. After this milestone no further Mozilla or chipset vendor specific changes will be accepted. At this point all Mozilla wanted blockers should be resolved leading us to zero blockers. This drop dead date indicates that we are ready to declare a Release Candidate (RC) and Original Equipment Manufacturers (OEM) / Original Device Manufacturers (ODM) can pick our release for their test cycle. The following criteria needs to be met. | This Code Complete (CC) milestone marks the completion of the release from Mozilla and partner chipset vendors. This is our declaration that we are ready to ship. After this milestone no further Mozilla or chipset vendor specific changes will be accepted. At this point all Mozilla wanted blockers should be resolved leading us to zero blockers. This drop dead date indicates that we are ready to declare a Release Candidate (RC) and Original Equipment Manufacturers (OEM) / Original Device Manufacturers (ODM) can pick our release for their test cycle. The following criteria needs to be met. |