Confirmed users, Bureaucrats and Sysops emeriti
525
edits
Hannahkane (talk | contribs) No edit summary |
|||
Line 44: | Line 44: | ||
== How It Will Work == | == How It Will Work == | ||
Create a “core project team” comprised of cross-section of FTEs on a 6 month special assignment. | Create a “core project team” comprised of cross-section of FTEs on a 6 month special assignment. | ||
The roles in this team are still TBD, but likely consist of at least: | |||
* Product design: requirements gathering, stakeholder validation, etc (maybe Bryan Clark?) | |||
* Project coordinator: ensuring strong communication within the team, to other Mozilla stakeholders, and to local teams | |||
* Interaction & prototype design: everything from paper prototypes to wireframes that can be assessed in field tests and other user testing scenarios | |||
* Developers, with a particular focus on rapid prototyping / iteration, good UX instinct | |||
This team will work closely with Ben Moskowitz and David Ascher, and periodically report into the Steering Committee. No HR changes to take place for existing staff (they would be seconded to the project for a fixed duration). | |||
== Why It Matters == | == Why It Matters == |