Breakpad/Status Meetings/2015-07-22: Difference between revisions
< Breakpad | Status Meetings
Jump to navigation
Jump to search
m (→Travel, etc) |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 20: | Line 20: | ||
=== AWS === | === AWS === | ||
* SSL cert so we can use crash-stats.allizom.org instead of mocostaging? | |||
=== DB === | === DB === | ||
Line 26: | Line 27: | ||
=== Other === | === Other === | ||
* ADI and Hive and AWS? | |||
** there's a VM in SCL that runs crontabber for one job to connect to hive and push ADI data to Socorro | |||
** we don't get that info for stage | |||
** let's modify the cron job to write to stage _and_ prod | |||
* Untagged: http://mzl.la/1HxZ4Gu | |||
* Atlas integration is mostly done | |||
** https://atlas.hashicorp.com/mozilla/ | |||
** coordination and control for our infra | |||
== Project Updates == | == Project Updates == | ||
Line 35: | Line 44: | ||
== other business == | == other business == | ||
* Lars has a patch that will remove arguments from signatures | |||
** needs some care. this data change is going to break a ton of things | |||
** needs verification on stage to ensure we want to go ahead with this breaking change | |||
** rollback will require some days of reprocessing, and we'd prefer to do it over a weekend | |||
** we may want to put this off until mid-August | |||
== Travel, etc == | == Travel, etc == |
Latest revision as of 18:19, 22 July 2015
« previous meeting — index – next week » create?
Meeting Info
Breakpad status meetings occur on Wed at 11:00am Pacific Time.
Conference numbers:
Vidyo: Stability 650-903-0800 x92 conf 98200# 800-707-2533 (pin 369) conf 98200#
IRC backchannel: #breakpad
Mountain View: Dancing Baby (3rd floor)
Operations Updates
AWS
- SSL cert so we can use crash-stats.allizom.org instead of mocostaging?
DB
ES
Other
- ADI and Hive and AWS?
- there's a VM in SCL that runs crontabber for one job to connect to hive and push ADI data to Socorro
- we don't get that info for stage
- let's modify the cron job to write to stage _and_ prod
- Untagged: http://mzl.la/1HxZ4Gu
- Atlas integration is mostly done
- https://atlas.hashicorp.com/mozilla/
- coordination and control for our infra
Project Updates
Socorro Bug Tracker
this week's bugs
PR Triage
other business
- Lars has a patch that will remove arguments from signatures
- needs some care. this data change is going to break a ton of things
- needs verification on stage to ensure we want to go ahead with this breaking change
- rollback will require some days of reprocessing, and we'd prefer to do it over a weekend
- we may want to put this off until mid-August
Travel, etc
- lars
- PyOhio - Thursday, July 30 - Monday, August 2
- PTO - Monday, August 2 - Tuesday, August 11