Confirmed users
2,456
edits
(→Notes) |
|||
Line 87: | Line 87: | ||
* Talos can be handled later if required. Its scheduling is pretty straightforward. It's also a good piece to test in parallel with the build bits. | * Talos can be handled later if required. Its scheduling is pretty straightforward. It's also a good piece to test in parallel with the build bits. | ||
* Release configs can be handled later as well. We're going to be rolling out onto a few branches at first. Until all the current masters are moved over, releases can be done on the old masters. |